Production

Two factories, CNC lines, and a house that arrives numbered in the order it goes up. This is what happens between the drawing and the truck.


1. Design

Every project starts with what the building has to do and where it is going. We draw it in CAD, and alongside the architectural drawings we prepare the production drawings and the material specification. Where it helps the decision, we also produce 3D visualisations.

Construction requirements, production limits and the specifics of log construction are taken into account at this stage, not discovered later on site.


2. Material

We use only slow-grown Nordic spruce and pine with a dense grain. Solid logs are pre-dried to a moisture content of 20% (±2%); the lamellas in laminated logs to 13% (±4%). Material that does not meet the requirement does not go into the line.


3. Production

Parts are cut on automatic CNC lines, which is what makes the precision repeatable and the use of raw material economical. Openings, corner joints and grooves are machined from the same file the drawings came from, so what is on the plan is what arrives.

We value natural materials, environmentally sustainable solutions and a production process that is as close to waste-free as we can make it.


4. Numbering and packing

Every part that comes off the line is numbered according to the project specification, in the order it will be erected. Doors and windows travel in the same package. Before the truck leaves, the load is checked against the part list so that nothing is missing when it reaches the site.

The packaging is weatherproof. A house that stands in the rain for a week before the crew arrives is a normal situation and it should not be a problem.


5. Delivery

We hold no standard stock. Every building is made to order, which means the delivery date is driven by the production queue and the specification of the house rather than by what happens to be in a warehouse.

While the kit is in production, the site work can go ahead: foundations, water, drainage and electricity can all be prepared so that the crew can start on the day the truck arrives.

In the delivery kit

  • Wall logs, numbered in erection order
  • Floor and roof structure with boards
  • Solid wood doors and windows
  • Storm bracing, anchors and fixings
  • Assembly drawings and part list
  • Optional: roof covering, insulation, stairs

Not included

  • Foundation work of any type
  • Erection on site
  • Electrical installation
  • Water and drainage
  • Interior finishing and wood treatment
  • Building permits and local approvals

Transport is usually not included in the price of the kit. The kit is priced ex works and the transport cost is agreed separately with each customer, because it depends entirely on the destination.