FAQ
Planning and permits
t depends on the country and often on the municipality, so check locally before you order. As an example, in Estonia a building with a footprint under 20 m² needs no permit and no notice, only the neighbours’ agreement and compliance with fire safety rules, which normally means at least 8 m between buildings. From 20 to 60 m² a building notice and a building design have to be submitted to the local authority.
We supply the drawings you need for the application. We do not apply for permits on your behalf.
The foundation type is decided by the ground conditions, the site and the size of the building, not by the fact that it is made of timber. All common types work: post, strip and slab foundations. For smaller garden houses a block or paving base on a compacted bed is often enough.
We supply the impregnated bearers and the setting-out drawing. The foundation itself is built by your contractor.
Yes. One of the advantages of log construction is that it can be erected all year round. Timber is not afraid of cold.
Yes. All the usual solutions for electricity, water and drainage can be used in a log building. They are installed on site, by your own trades, after the shell is standing.
Price and ordering
There is no average, in the same way there is no average price for a car. The wall profile, the size, the corner type, the glazing, the roof and the destination all move the figure. Tell us what you are planning and we will put together a calculation based on your requirements, and from there a firm quotation.
As a rule a log building costs less than a masonry or a comparable timber-frame house of the same size. How much less depends on more than the material: the labour cost on site matters as well, and a numbered kit goes up faster than a house built stick by stick.
Not significantly. Design and production technology are closely integrated here, so drawing a new project does not add a large amount to the final price. Choose the model that fits the plot and the use, rather than the one you assume is cheaper.
Usually not. The kit is priced at the factory gate and the transport cost is agreed separately with each customer, because it depends entirely on the destination and the load.
Yes. We do not produce off-the-shelf buildings. Every house we make is an individual solution, and the models in our catalogue are examples of what is possible rather than a fixed range. Changes are normal and are dealt with at the design stage. If necessary, our architect will prepare a complete design from your idea.
Material and construction
Yes, all of it is kiln dried. Solid logs are dried to a moisture content of 20% (±2%) and the lamellas in laminated logs to 13% (±4%). Drying before milling is what keeps the wall straight once it is standing.
With solid logs, roughly 3 to 4% of the wall height. With laminated logs about 2%. Settlement is accounted for in the design, with adjustable supports and settlement gaps above openings, so it does not affect the finished building.
Timber is the best natural insulator nature provides, but wall thickness alone is not enough for a low-energy building. The roof, the floor, the glazing and above all the airtightness of the joints decide the result. If the building has to meet a specific standard in your country, say so early and we will design for it.
Outside, use a certified wood preservative. We recommend Remmers products and Aidol HK-Lasur for the exterior: it protects the timber and lets the surface breathe. Inside, Remmers also offers a wide choice, and natural finishes such as linseed oil and beeswax work well.
Whatever you choose, treat the timber as soon as possible after erection, not the following season.
The kit contains the timber parts, windows, doors, stairs and similar components. The foundation, water and drainage, roof covering and electrical installation are not included, although roof covering and insulation can be added to the order if you want them from us.
The full scope is always written out in the quotation. Nothing in the delivery is left to assumption.
It needs attention in the first years: the adjustable supports on posts and vertical members have to be checked and adjusted as the wall settles. The work is minor but it has to be done at the right time. We give precise instructions on handover, and if you prefer, the work can be ordered from a builder.
Physically, yes. Every part is numbered in the order it goes up and the assembly drawings are in the package. But building anything for the first time means learning on the job, and mistakes in a log wall are harder to correct than in a stud wall. An experienced crew is faster and the result is more predictable. Your decision, and we will support either way.
Still unanswered?
Send the question and we will answer it, usually the same day. If it is a question others ask too, it ends up on this page.
